PROJECTS : 2021

2021 Projects

These are the projects that we did in the year 2021. The projects are categorized by the year that we started the contract. If you are looking for a project that you thought might have been done in this year, check the year before and it could have been started then. A lot of our projects can last for more than a year and we also start projects towards the end of the year and they do carry over. Enjoy the projects descriptions and pictures. Since this is a new website we are still continuing to add pictures from past projects once we have scanned them to add them to the site. So if a project you are looking for doesn't have any pictures come back later to see if they have been added. Leave us a comment, in our Contact section of this site, about a project you would like to see pictures of and we will try to do those first.


Cherokee Removal Memorial Park Trail


Location:  Blythe Ferry, TN

January 2021 to March 2021

Project Description:

Cherokee Removal Memorial Park
This project was for the construction of about 2000 feet of compacted gravel surface trail with a grade suitable for wheelchair use.  This trail included about 200 feet of puncheon walkway and a couple benches at the original ferry crossing site to be used for reflection and contemplation.

-more-

Stonewall Resort State Park Trail

Location:  Roanoke, West Virginia

March 2021 to May 2021

Project Description:

Stonewall Resort Trail
This project was for the construction of about 2 miles of new trail and the reconstruction of about 1 mile of existing trail that had been recently built but not correctly and had several areas that exceeded 20% grade and needed to be relocated.

-more-

Montebello Condo Association Community Trail Rebuild

Location:  Alexandria, Virginia

May 2021 to current

Project Description:

Montebello Condo Association
This project was for the complete rebuild of the community trail at the  Montebello Condominium Complex in Alexandria Virginia.  This project included the replacement of old wooden steps with new steps, the addition of more wooden steps, the installation of puncheon walkways to allow for water to pass under the trail, the installation of new round metal handrails, the relocation of some areas of the trail to provide a better grade and the placement of compacted gravel along the entire trail.  This trail is in a community of mostly retired individuals and special consideration had to be taken into account.

-more-

Rockingham County Community College Introduction to Mechanized Construction Training

Location:  Rockingham County
North Carolina

October 2021

Project Description:

RCCC Mech Class
This was an introduction to Mechanized Trail Building class sponsored by Rockingham County Community College.

-more-