PROJECTS : 2017

2017 Projects

These are the projects that we did in the year 2017. The projects are categorized by the year that we started the contract. If you are looking for a project that you thought might have been done in this year, check the year before and it could have been started then. A lot of our projects can last for more than a year and we also start projects towards the end of the year and they do carry over. Enjoy the projects descriptions and pictures. Since this is a new website we are still continuing to add pictures from past projects once we have scanned them to add them to the site. So if a project you are looking for doesn't have any pictures come back later to see if they have been added. Leave us a comment, in our Contact section of this site, about a project you would like to see pictures of and we will try to do those first.

Seneca Rocks Trail Bridge Redeck
Location: Seneca Rocks, WV 

USDA Forest Service Discovery Center 

 November 2017

Project Description:

Seneca Rocks Trail Bridge
This project was to redeck a 40 lf ramp and the 150 lf bridge over the North Fork South Branch Potomac River.  

-more-

Western Piedmont Community College Bike Trail
Location: Western Piedmont Community College, Morganton North Carolina

November - December 2017

Project Description:

WPCC
This project was for the construction of a new bike and pedestrian trail on the campus of Western Piedmont Community College.  This trail is about 2 miles in length and designed for beginner bikers.

-more-

Picnic Table Construction
Location: Ona WV

September - October 2017

Project Description:

Picnic Tables
This project was for the construction of 21 heavy duty, vandal resistant picnic tables.  These tables were prefabricated and partially assembled in our shop then transported to Marlinton WV for final assemble.

-more-

Valley Divide Trail
Location: Sugar Grove, VA

Mount Rogers National Recreation Area

June - August 2017

Project Description:

Valley Divide Trail
This project is for the construction of 3 miles of new multi use trail catering to heavy horse traffic.  Included in this project was the construction of a new trailhead parking lot.

-more-