These are the projects that we did in the year 2009. The projects are categorized by the year that we started the contract. If you are looking for a project that you thought might have been done in this year, check the year before and it could have been started then. A lot of our projects can last for more than a year and we also start projects towards the end of the year and they do carry over. Enjoy the projects descriptions and pictures. Since this is a new website we are still continuing to add pictures from past projects once we have scanned them to add them to the site. So if a project you are looking for doesn't have any pictures come back later to see if they have been added. Leave us a comment, in our Contact section of this site, about a project you would like to see pictures of and we will try to do those first.

Potts Valley Rail Trail

Location:  Monroe County, WV
November 2009 - February 2010

Project Description:

Potts Valley Rail Trail
This project was for the construction of a hiking trail along the Potts Valley Railroad.  This line was abandon about 80 years ago and was being converted to a walking trail.  The project required the construction of a new side hill trail where the railroad trestle use to cross and the new construction of about a mile of trail to reconnect to the old rail bed.

-more-

Pandapus Pond Butterfly Trail
Location: Blacksburg, VA
September 2009

Project Description:

Pandapus Pond Trail
This project was the construction of a new trail to connect the Pandapus Pond parking lot to the new butterfly garden and wildlife watching area.

-more-

Montpelier Demonstration Trail
Location: Montpelier, VA
August 2009

Project Description:

Montpelier Trail
This project was for the construction of a new hiking trail in the forest behind Montpelier (James Madison's homeplace).  Great care had to be taken to avoid damaging large tree roots and to avoid sensative areas of historical significance.

-more-

Camp Arrowhead ADA Trail and Bridge
Location: Ona, WV
March 2009 - September 2009

Project Description:

ADA trail bridge
This project was for the construction of an ADA trail at Camp Arrowhead.  The project required a graded gravel trail with timber edging and no more than an 8% slope and the construction of several puncheon bridges over drains as well as several large log cribs and one 40 foot bridge.  This trail allows access to a larger area of the camp to people with a disability.  As well as access to the existing ADA fishing pier and ADA toilet.

-more-