|
1992 Projects
These are the projects that we did in the year 1992. The projects are categorized by the year that we started the contract. If you are looking for a project that you thought might have been done in this year, check the year before and it could have been started then. A lot of our projects can last for more than a year and we also start projects towards the end of the year and they do carry over. Enjoy the projects descriptions and pictures. Since this is a new website we are still continuing to add pictures from past projects once we have scanned them to add them to the site. So if a project you are looking for doesn't have any pictures come back later to see if they have been added. Leave us a comment, in our Contact section of this site, about a project you would like to see pictures of and we will try to do those first.
Whetstone Trail Construction and Reconstruction
Location: Virginia
Date
Project Description:
|
|
Involved the construction of new side hill treadway, switchbacks, waterbars, removal of hazard trees, clearing, grubbing, and construction of native stone cribbing. Both hand labor and a Gravely Tractor with a rotary cultivator as a trail machine were used to build the trail. This trail passes through stands of rhododendron and old growth Hemlocks requiring similar attention regarding protection of root systems, as in the proposed Montpelier project.
|
|
Stony Creek National Recreational Trail
Location: Corder Branch, Virginia
Date:
Project Description:
|
|
This project consisted of the construction of a 127LF three span glu-lam bridge delivered by helicopter. We received a SBA Directors Award of Excellence for this project. |
|