PROJECTS : 2024

2024 Projects

These are the projects that we did in the year 2022. The projects are categorized by the year that we started the contract. If you are looking for a project that you thought might have been done in this year, check the year before and it could have been started then. A lot of our projects can last for more than a year and we also start projects towards the end of the year and they do carry over. Enjoy the projects descriptions and pictures. Since this is a new website we are still continuing to add pictures from past projects once we have scanned them to add them to the site. So if a project you are looking for doesn't have any pictures come back later to see if they have been added. Leave us a comment, in our Contact section of this site, about a project you would like to see pictures of and we will try to do those first.

We are still in the process of uploading photos for these projects.  Please come back in the future to see the pages.


Festival Park Walking Trail System
Location:  Check, Virginia

April 2024 - May 2024

Project Description:

Festival Park Trail
This project was for the Construction of a new trail system for use at Festival Park in Check Virginia.  This park is the new home of Floydfest, a new venue that hosts the annual music festival in Floyd County Virginia.  This project was for the construction of 14 individual trails of various lengths for use by the festival attendees to access diffent venue and stage sites.  Included in this project was the construction of approximately 400 linear feet of crushed stone surfaced trail near the main stage area.

-more-

WVU Woodlot Trail and Bridge

Location:  Morgantown, West Virginia

June 2024 - November 2024

Project Description:

WVU Woodlot Trail and Bridge
This project was for the construction of approximately 1000 linear feet of new 5 foot wide multi use trail.  This project included the construction of a hardened creek crossing, the construction of a new FRP bridge and the constuction of  an elevated walkway crossing a wetland with Bald Cypress trees that needed to be preserved.  Also included in this project was the construction of several grade reversals along a old road that was being used as access to the forest area for conservation, research, study and maintenance.

-more-

North Carolina Trail Layout and Design


Location:  Marion, North Carolina

August 2024

Project Description:

North Carolina Trail Layout
This project was for the layout and design of about 8 miles of new trail to be construction in the future.  This trail will be part of a longer new cross state trail.  This layout included a GIS data collection with the placement of  potential cribbing, bridges and hardened creek crossing using native stone.

-more-