2024 Projects
These
are the projects that we did in the year 2022. The projects are
categorized by the year that we started the contract. If you are
looking for a project that you thought might have been done in this
year, check the year before and it could have been started then. A lot
of our projects can last for more than a year and we also start
projects towards the end of the year and they do carry over. Enjoy the
projects descriptions and pictures. Since this is a new website we are
still continuing to add pictures from past projects once we have
scanned them to add them to the site. So if a project you are looking
for doesn't have any pictures come back later to see if they have been
added. Leave us a comment, in our Contact
section of this site, about a project you would like to see pictures of
and we will try to do those first. We are still in the process of uploading photos for these projects. Please come back in the future to see the pages.
Festival Park Walking Trail System
Location: Check, Virginia April 2024 - May 2024
Project Description:
|
|
This
project was for the Construction of a new trail system for use at
Festival Park in Check Virginia. This park is the new home of
Floydfest, a new venue that hosts the annual music festival in Floyd
County Virginia. This project was for the construction of 14
individual trails of various lengths for use by the festival attendees
to access diffent venue and stage sites. Included in this project
was the construction of approximately 400 linear feet of crushed stone
surfaced trail near the main stage area.
-more-
|
WVU Woodlot Trail and Bridge
Location: Morgantown, West Virginia
June 2024 - November 2024
Project Description:
|
|
This
project was for the construction of approximately 1000 linear feet of
new 5 foot wide multi use trail. This project included the
construction of a hardened creek crossing, the construction of a new
FRP bridge and the constuction of an elevated walkway crossing a
wetland with Bald Cypress trees that needed to be preserved. Also
included in this project was the construction of several grade
reversals along a old road that was being used as access to the forest
area for conservation, research, study and maintenance.
-more-
|
North Carolina Trail Layout and Design Location: Marion, North Carolina
August 2024
Project Description:
|
|
This
project was for the layout and design of about 8 miles of new trail to
be construction in the future. This trail will be part of a
longer new cross state trail. This layout included a GIS data
collection with the placement of potential cribbing, bridges and
hardened creek crossing using native stone.
-more-
|
|
|
|
|
|
|
|