2021 Projects
These
are the projects that we did in the year 2021. The projects are
categorized by the year that we started the contract. If you are
looking for a project that you thought might have been done in this
year, check the year before and it could have been started then. A lot
of our projects can last for more than a year and we also start
projects towards the end of the year and they do carry over. Enjoy the
projects descriptions and pictures. Since this is a new website we are
still continuing to add pictures from past projects once we have
scanned them to add them to the site. So if a project you are looking
for doesn't have any pictures come back later to see if they have been
added. Leave us a comment, in our Contact
section of this site, about a project you would like to see pictures of
and we will try to do those first.
Cherokee
Removal Memorial Park Trail
Location: Blythe Ferry, TN
January 2021 to March 2021
Project Description:
|
|
This project was for the
construction of about 2000
feet of compacted gravel surface trail with a grade suitable for
wheelchair use. This trail included about 200 feet of
puncheon
walkway and a couple benches at the original ferry crossing site to be
used for reflection and contemplation.
-more-
|
Stonewall
Resort State Park Trail
Location: Roanoke, West Virginia
March 2021 to May 2021
Project Description:
|
|
This project was for the
construction of about 2 miles
of new trail and the reconstruction of about 1 mile of existing trail
that had been recently built but not correctly and had several areas
that exceeded 20% grade and needed to be relocated.
-more-
|
Montebello
Condo Association Community Trail Rebuild
Location: Alexandria, Virginia
May 2021 to current
Project Description:
|
|
This project was for the
complete rebuild of the community trail at the Montebello
Condominium Complex in Alexandria Virginia. This project
included the replacement of old wooden steps with new steps, the
addition of more wooden steps, the installation of puncheon walkways to
allow for water to pass under the trail, the installation of new round
metal handrails, the relocation of some areas of the trail to provide a
better grade and the placement of compacted gravel along the entire
trail. This trail is in a community of mostly retired
individuals and special consideration had to be taken into account.
-more-
|
Rockingham County Community College Introduction to Mechanized Construction Training
Location: Rockingham County North Carolina
October 2021
Project Description:
|
|
This was an introduction to Mechanized Trail Building class sponsored by Rockingham County Community College.
-more-
|
|