Fonta
Flora Sidepath Trail
Location: Burke County North Carolina
January 2020 to May 2020
Project Description:
|
|
This was the
construction of about 1400 feet of earthen trail and about 1400 feet of
gravel surfaced trail that includes 500 feet of cribbed trail
-more-
|
South
Carolina State Parks Trail Layout and Design Class
Location: Table Rock State Park, Pickens South Carolina
February 2020
Project Description:
|
|
This was an introduction
to trail layout and design for South Carolina State Parks
-more-
|
South
Carolina State Parks Introduction to Mechanized Construction Training
Location: Table Rock State Park, Pickens South Carolina
February 2020
Project Description:
|
|
This was an introduction
to mechanized trail construction training for South Carolina State
Parks.
-more-
|
Langhorne Road Bridge Renovation
Location: Lynchburg, VA
May 2020 - October 2020
Project Description:
|
|
This project was for the
reconstruction and conversion of a 300 foot railroad bridge into a food bridge.
-more-
|
Rockingham
County Community College Introduction to Mechanized Construction
Training
Location: Rockingham County North Carolina
September 2020
Project Description:
|
|
This was an introduction
to Mechanized Trail Building class sponsored by Rockingham County
Community College.
-more-
|
Fonta
Flora Boardwalk
Location: Burke County, North Carolina
September 2020 - December 2020
Project Description:
|
|
This project if for the
construction of 525 feet of boardwalk on the fonta flora trail along
the edge of Lake James.
-more-
|
North
Carolina State Parks, Introduction to Mechanized Construction Training
Location: North Carolina
October 2020
Project Description:
|
|
This was an introduction
to mechanized trail construction training for North Carolina State
Parks in preparation for their purchase of a Sutter Trail Dozer,
-more-
|