These
are the projects that we did in the year 2008. The projects are
categorized by the year that we started the contract. If you are
looking for a project that you thought might have been done in this
year, check the year before and it could have been started then. A lot
of our projects can last for more than a year and we also start
projects towards the end of the year and they do carry over. Enjoy the
projects descriptions and pictures. Since this is a new website we are
still continuing to add pictures from past projects once we have
scanned them to add them to the site. So if a project you are looking
for doesn't have any pictures come back later to see if they have been
added. Leave us a comment, in our Contact
section of this site, about a project you would like to see pictures of
and we will try to do those first.
Himot Property Trails August, 2008 Blue Grass, Virginia
Project Description:
|
|
This project is for the construction of a new trail network on private
property. The trail network included 6 different trails that gives the landowner
3.96 miles of trail for access over there entire property.
-more-
|
|
Eastern Divide Ranger District Work February - June,
2008 Blacksburg, Virginia
Project Description:
|
|
This contract was for various projects throughout the Eastern Divide Ranger
District near Blacksburg, VA. Projects in this contract consisted of the
construction of a new trail to Pearis Cemetary, a Fire Ring at Boley Field, a
Barrier Fence at Interior Picnic Area, a Foundation for a Wildlife Cabin at
Pandapas Pond and pouring a concrete floor at the Rifle Range.
-more-
|
|
Wildwood Park Trail Rehab July, 2008 Radford, VA
Project Description:
|
|
This project was for resurfacing the trail at Wildwood Park in Radford. The
project consisted of placing a layering of crusher run over areas of the trail
that had erosion problems. There was also the installation of some water bars to
help solve the water run off problem.